Condition trend

Condition and trend by equipment, Rod Mill 2

Showing issued releases of the client condition register. Nothing is recalculated – every cell is a release as issued.

Latest release

Condition history

One row per item, one column per issued release, colour only. A white notch marks the release where the state changed. Hover any cell for its register label. Measurement points are listed under each item and coloured by that point’s own finding in the latest register.

4 – Urgent action / confirmed failure3 – Action / engineer assessment / fitment hold2 – Monitor1 – NormalHeld out of service – state unchanged

Where the plant stands now

Every item in live assessment, in its current zone, with how long it has held that state. Items already actioned and held out of service are listed separately beneath and are not counted in any zone.

Held – actioned, awaiting return to service2 items · excluded from the zone counts above
P2
Pump 2 Bearing AssemblyConfirmed failure · held since 20 July 2026 · 10 releases in state
InboardOutboard
PM2
Pump Motor 2Confirmed failure · held since 20 July 2026 · 10 releases in state
DENDE

Basis. Combined V-belt drive and pump-bearing failure on the RM2 Pump 2 set, 20 July 2026 at approximately 03:30, recorded in failure report OPT-RM2-VFR-20260720 (final issue, validation lock applied). The set is out of service under repair and the client-confirmed service-state update of 14 August 2026 records the sensors physically removed. Closes out on an authorised return-to-service commissioning record, followed by re-baselining of the drive and pump measurements.

What changed

Every state change in the window, in order. events across the releases shown.

    Provenance. Cells are the public release documents in optimaltrend-api/data/ projected by /client-condition-dashboard/condition-trend, which collapses correction chains through supersedesReleaseId and SHA-256 hashes each payload. Zones and labels are read from chartEvidencePolicy.findings and statusLabel. The RM2 Pump 2 set (P2, PM2) is shown for continuity but excluded from the action counts: the failure is recorded in OPT-RM2-VFR-20260720 and the set is out of service under repair. History spans 9 July to 18 August 2026 as overlapping daily rolling windows, so month and quarter roll-ups are not yet populated. Findings are advisory and require engineering review before any maintenance action is authorised.