Rod Mill 2 – state of each monitored item

The condition state carried by the detailed technical assessment, and the validated action required where one applies. Evidence, spectra and engineer findings remain in the detailed technical report, which this summary accompanies and does not replace.

OAMSA-RM2-EXEC
2026-08-06 to 2026-08-13
Release2026-08-06_2026-08-13 Report run14 Aug 2026 23:02
[Africa/Windhoek UTC+02:00] Scope10 monitored equipment items

Decision summary

What needs attention, at what urgency, and how the portfolio has moved over the last ten issued releases.

Urgent · rank 4
0

No item requires urgent action this period. The RM2 Pump 2 set is a known failure already actioned – see notes.

Action or confirm · rank 3
5

Two require engineering action, three are held pending sensor fitment verification.

Normal · rank 1
3

No reportable anomaly in the window; routine predictive analytics continue.

53
5 of 8 items in live assessment carry an action; 2 further items are held as known failuresPortfolio composition, this release
Governance. Vibration severity is graded against ISO 20816-3. Findings are advisory and are considered alongside operating context and engineering inspection before maintenance decisions are made; all findings in this summary require engineering review before any maintenance action is authorised.

Condition and validated action by equipment

Ordered by severity. The state, the action and the response timing are those recorded in the issued register – nothing is re-graded here.

3Action
Pump Motor 1Rossing Uranium / Rod Mill 2 / Pump Motor 1 (2 measurement points)
3 - Action

Priority evidence review. inspect the motor structure and sift foot condition. measure line current for imbalance of motor supply current.

Measurement points
DE2150088109 Aug 2026 12:30 [Africa/Windhoek (UTC+02:00)] - Critical vibration outside confirmed operation - Discharge Pump Motor 1 DECritical vibrationtemp
NDE2150087812 Aug 2026 06:31 [Africa/Windhoek (UTC+02:00)] - Critical vibration outside confirmed operation - Discharge Pump Motor 1 NDECritical vibrationtemp

Response timing. Engineering review within 24 hours; validate sensor mounting and timestamp alignment, inspect the nearest waveform/FFT evidence, and re-measure under a confirmed operating condition within 72 hours before assigning a defect mechanism.

10-release trend▼ Improving
3Action
Pinion Shaft AssemblyRossing Uranium / Rod Mill 2 / Pinion Shaft Assembly (2 measurement points)
3 - Action - engineer assessment

Priority evidence review. Visual inspection of the teeth on the next available opportunity, oil analysis is required to correlate mechanical wear. Verify alignment of the Pinion shaft

Measurement points
DE2150089607 Aug 2026 02:40 [Africa/Windhoek (UTC+02:00)] - Elevated vibration trend - Pinion DEElevated trendtemp
NDE2150087914 Aug 2026 01:59 [Africa/Windhoek (UTC+02:00)] - Vibration acceptable - Pinion NDE; the vibration analyst assessment requires weekly monitoring.Vibration acceptabletemp

Response timing. Engineering review within 24 hours; validate sensor mounting and timestamp alignment, inspect the nearest waveform/FFT evidence, and re-measure under a confirmed operating condition within 72 hours before assigning a defect mechanism.

10-release trend● Stable
3Action
Discharge Pump Motor 4 NDERossing Uranium / Rod Mill 2 / Discharge Pump Motor 4 NDE (2 measurement points)
3 - Sensor fitment hold

Priority evidence review. Treat recorded evidence as historical only until fitment and signal health are verified.

Measurement points
DE2150089514 Aug 2026 01:59 [Africa/Windhoek (UTC+02:00)] - Vibration acceptable - Discharge Pump Motor 4 DE; the vibration analyst assessment requires weekly mVibration acceptabletemp
NDE21500880Current fitment hold - sensor 21500880 loose or not on machine - Discharge Pump Motor 4 NDEFitment holdtemp

Response timing. Engineering review within 24 hours; validate sensor mounting and timestamp alignment, inspect the nearest waveform/FFT evidence, and re-measure under a confirmed operating condition within 72 hours before assigning a defect mechanism.

10-release trend● Stable
3Action
Pump 4 Bearing AssemblyRossing Uranium / Rod Mill 2 / Pump 4 Bearing Assembly (2 measurement points)
3 - Sensor fitment hold

Priority evidence review. Treat recorded evidence as historical only until fitment and signal health are verified.

Measurement points
Inboard21500884Pending - Evidence required - Discharge Pump 4 Inboard; the vibration analyst assessment requires weekly monitoring.Evidence requiredtemp
Outboard21500891Current fitment hold - sensor 21500891 loose or not on machine - Discharge Pump 4 OutboardFitment holdtemp

Response timing. Engineering review within 24 hours; validate sensor mounting and timestamp alignment, inspect the nearest waveform/FFT evidence, and re-measure under a confirmed operating condition within 72 hours before assigning a defect mechanism.

10-release trend● Stable
3Action
Pump 3 Bearing AssemblyRossing Uranium / Rod Mill 2 / Pump 3 Bearing Assembly (2 measurement points)
3 - Sensor fitment hold

Priority evidence review. Treat recorded evidence as historical only until fitment and signal health are verified.

Measurement points
Inboard2150088314 Aug 2026 01:51 [Africa/Windhoek (UTC+02:00)] - Vibration acceptable - Discharge Pump 3 Inboard; the vibration analyst assessment requires weekly moVibration acceptabletemp
Outboard21500888Current fitment hold - sensor 21500888 loose or not on machine - Discharge Pump 3 OutboardFitment holdtemp

Response timing. Engineering review within 24 hours; validate sensor mounting and timestamp alignment, inspect the nearest waveform/FFT evidence, and re-measure under a confirmed operating condition within 72 hours before assigning a defect mechanism.

10-release trend● Stable
1Normal
Discharge Pump 1Rossing Uranium / Rod Mill 2 / Discharge Pump 1 (2 measurement points)
1 - Normal

Normal - no reportable anomaly. No action required. Continue routine monitoring.

Measurement points
Inboard2150088714 Aug 2026 01:59 [Africa/Windhoek (UTC+02:00)] - Vibration acceptable - Discharge Pump 1 InboardVibration acceptabletemp
Outboard2150089314 Aug 2026 01:59 [Africa/Windhoek (UTC+02:00)] - Vibration acceptable - Discharge Pump 1 OutboardVibration acceptabletemp

Response timing. No corrective action; continue routine predictive monitoring.

10-release trend▲ Deteriorating
1Normal
Main MotorRossing Uranium / Rod Mill 2 / Main Motor (2 measurement points)
1 - Normal

Normal - no reportable anomaly. No action required. Continue routine monitoring.

Measurement points
DE2150089814 Aug 2026 01:59 [Africa/Windhoek (UTC+02:00)] - Vibration acceptable - Main Motor DEVibration acceptabletemp
NDE2150069514 Aug 2026 01:59 [Africa/Windhoek (UTC+02:00)] - Vibration acceptable - Main Motor NDEVibration acceptabletemp

Response timing. No corrective action; continue routine predictive monitoring.

10-release trend● Stable
1Normal
Discharge Pump Motor 3Rossing Uranium / Rod Mill 2 / Discharge Pump Motor 3 (2 measurement points)
1 - Normal

Normal - no reportable anomaly. No action required. Continue routine monitoring.

Measurement points
DE2150069114 Aug 2026 01:59 [Africa/Windhoek (UTC+02:00)] - Vibration acceptable - Discharge Pump Motor 3 DEVibration acceptabletemp
NDE2150089714 Aug 2026 01:59 [Africa/Windhoek (UTC+02:00)] - Vibration acceptable - Discharge Pump Motor 3 NDEVibration acceptabletemp

Response timing. No corrective action; continue routine predictive monitoring.

10-release trend● Stable
4 – Urgent action / confirmed failure3 – Action / engineer assessment / fitment hold2 – Monitor1 – NormalEvidence required

Temperature trend – all monitored equipment

Continuous sensor temperature for every monitored item, 10 to 18 August 2026. All strips share one vertical scale of 10 to 56 °C so they can be read against each other; the marker is the latest sample.

Pinion Shaft Assemblynode 795be3e7 · 1,495 samples
1020304050°C10 Aug18 Aug
23 min44.0 mean53 max35°C latest
Pump Motor 1node 4df87d31 · 1,682 samples
1020304050°C10 Aug18 Aug
21 min37.4 mean50 max29°C latest
Pump 1 Bearing Assemblynode 75d24706 · 1,650 samples
1020304050°C10 Aug18 Aug
15 min36.4 mean49 max28°C latest
RM2 Main Motornode 0257a4b9 · 1,460 samples
1020304050°C10 Aug18 Aug
20 min33.3 mean46 max36°C latest
Pump Motor 4node 155c40d1 · 2,624 samples
1020304050°C10 Aug18 Aug
14 min21.9 mean30 max21°C latest
Pump Motor 3node 2be52fb6 · 1,500 samples
1020304050°C10 Aug18 Aug
14 min22.2 mean29 max22°C latest
Pump 4 Bearing Assemblynode fd3d55bd · 1,524 samples
1020304050°C10 Aug18 Aug
12 min20.8 mean28 max24°C latest
Pump 3 Bearing Assemblynode 7e71ad23 · 1,530 samples
1020304050°C10 Aug18 Aug
13 min20.8 mean27 max24°C latest
Pump 2 Bearing Assemblynode c95252c4
No temperature signal in the window
sensors 21500889 / 21500890 removed 14 Aug 2026
Pump Motor 2node 885b465f
No temperature signal in the window
DE sensor 21500885 offline with the Pump 2 set; NDE not instrumented

Coverage. Temperature resolves per equipment node, not per measurement point – the DE and NDE channels of an item share one node and return one series. Eight of the ten monitored items return a continuous signal; the RM2 Pump 2 set returns none and is shown explicitly rather than omitted. Series begin on 10 August 2026, so this window carries eight days of temperature evidence rather than the full report period.

Temperature axis is °C. A trend is included where a mapped sensor signal exists; it supports corroboration of vibration findings and is not a direct girth or trunnion measurement unless that point is explicitly mapped. Source: Optimal Trend monitoring data, 2026-08-06 to 2026-08-13.

Notes – known failures already actioned

Recorded for completeness and excluded from the action counts above. No further action is requested against these items until the stated close-out condition is met.

Known failureActioned
Pump 2 Bearing AssemblyRossing Uranium / Rod Mill 2 / Pump 2 Bearing Assembly (2 measurement points)

Combined V-belt drive and pump-bearing failure on the RM2 Pump 2 set, 20 July 2026 at approximately 03:30, recorded in failure report OPT-RM2-VFR-20260720 (final issue, validation lock applied). The set is out of service under repair; the client-confirmed service-state update of 14 August 2026 records the sensors physically removed. No measurement is expected during active repair.

Measurement points
Inboard215008892026-07-20 03:30 - Confirmed failure and out-of-service status - RM2 Pump 2 setConfirmed failureno temp
Outboard215008902026-07-20 03:30 - Confirmed failure and out-of-service status - RM2 Pump 2 setConfirmed failureno temp

Closes out on. An authorised return-to-service commissioning record, followed by re-baselining of the drive and pump measurements. Until then this item is excluded from the action counts, from fitted-sensor coverage and from duty-pair inference, and no stale-data or remount action is raised against it.

Known failureActioned
Pump Motor 2Rossing Uranium / Rod Mill 2 / Discharge Pump Motor 2 / DE measurement point

Combined V-belt drive and pump-bearing failure on the RM2 Pump 2 set, 20 July 2026 at approximately 03:30, recorded in failure report OPT-RM2-VFR-20260720 (final issue, validation lock applied). The set is out of service under repair; the client-confirmed service-state update of 14 August 2026 records the sensors physically removed. No measurement is expected during active repair.

Measurement points
DE215008852026-07-20 03:30 - Confirmed failure and out-of-service status - RM2 Pump 2 setConfirmed failureno temp
NDEno sensorNot instrumented - no sensor fittedNot instrumented - no sensor fittedno temp

Closes out on. An authorised return-to-service commissioning record, followed by re-baselining of the drive and pump measurements. Until then this item is excluded from the action counts, from fitted-sensor coverage and from duty-pair inference, and no stale-data or remount action is raised against it.

Provenance. Every state, action and response timing above is rendered from release document condition-register-2026-08-06_2026-08-13.json (schemaVersion 2, sourceRegisterCount 10) as issued in the Rod Mill 2 8-day exceptions report. State definitions, severity gating and response timings are those already defined in routes_client_condition_dashboard.py. The ten-release trend strip reads the public release documents in optimaltrend-api/data/. The RM2 Pump 2 set is presented under notes rather than as an open action on the basis of failure report OPT-RM2-VFR-20260720 and the client-confirmed service-state update of 14 August 2026, both already cited in the issued register. The temperature series are the four mapped exception points carried in the detailed technical report for the same period, recovered from that report’s own plotted values against its stated axis (10 to 51 °C); series are paired to point names in the order the report legend lists them, which should be confirmed against the generator before issue. No state, action, timing, temperature value or note text on this page was authored for the summary.